Over 17 years of experience, more than 100 high-quality studies and projects.

Macroeconomic Reports
All rights reserved. ©2009. ADHOC Consultores Asociados S.C.
 

Our experience

Over 17 years of experience, more than 100 high-quality studies and projects.

At ADHOC we hold human talent in high esteem, appreciate it and cultivate it.

At ADHOC we hold human talent in high esteem, appreciate it and cultivate it.

ADHOC has a professional and experienced staff and, since its foundation in 2007, has accumulated extensive experience in the development of highly complex studies and projects, especially in the mobility and transportation sector:

ADHOC has a professional and experienced staff and, since its foundation in 2007, has accumulated extensive experience in the development of highly complex studies and projects, especially in the mobility and transportation sector:

Urban mobility

  • Mexibus Line IV ecological corridor “Indios Verdes – Tlanepantla – Ecatepec – Tecámac” in the State of Mexico.
    Review, validation of supply and demand, and integration and participation of carriers.
  • Integrated Urban Transportation System Mérida y su Zona Metropolitana. (SITUR)
    TECHNICAL CONSULTING, STUDY DEVELOPMENT AND PROJECT MANAGEMENT.
  • MASS PASSENGER TRANSPORT CORRIDOR, ROUTE 1, CHACHAPA – TLAXCALANCINGO
    Project management and start-up consulting. 
  • Urban Mobility Project of the City of Chilpancingo, Gro.
    Business Plan and Pre-Feasibility Studies.
  • Toluca-Tenango and Ramales Corridor.
    Consulting and studies for its implementation.
  • Zinancantepec-Lerma Mass Transit Corridor in Edomex.
    Consulting for infrastructure concessions.
  • Mexibus 1 Azteca City – Tecámac Corridor.
    Design, Strategy and Implementation.
  • “Metrobús Laguna” Project
    Consulting and studies for its implementation.
  • Mexibus IV Indios Verdes-Tlalnepantla-Ecatepec-Tecámac, State of Mexico
    Proposal for Restructuring the Route System.
    Review, validation of supply and demand, and integration and participation of carriers.

Rail Transportation

  • Expansion of System 1 of the Lechería-Xaltocan-New Santa Lucía International Airport Suburban Train.
    Demand study, feasibility and cost-benefit analysis. 
  • Railway system between the municipalities and/or mayors' offices of Chalco, Valle de Chalco, Ixtapaluca, La Paz, Chimalhuacán, Chicoloapan, Iztapalapa and Tláhuac.
    Comprehensive management for conducting pre-investment studies.
  • Puebla-Cholula Tourist Train.
    Preparation of Studies and Executive Project.
  • Transpeninsular train from Chichen-Itza to Punta Venado and Cancun.
    Preliminary projects, basic engineering and executive projects.
  • Guadalajara Urban Electric Train (Line 1)
    Legal, Technical, Financial and Management Consulting for the Project's expansion and remodeling.
  • Merida Punta Venado Transpeninsular Train.
    Complementary studies for the preparation of the executive draft.
  • TEG- Guanajuato Express Train.
    Preparation of the cost-benefit analysis and financial evaluation of the project.
  • Mass Passenger Transport Toluca-Valley of Mexico. 
    Pre-investment studies and cost-benefit analysis of the project.
  • STC Metrorrey.
    Technical assistance in the development of expansion projects.
  • Rail projects for Bombardier.
    Consulting for the identification, development, evaluation and execution of projects.
  • Suburban Railway System 1 of the Buenavista – Cuautitlán Metropolitan Area (ZMVM), 27 km.
    Design, strategy and implementation.
  • Suburban Train Expansion Project to extend the six terminals along the Lechería – Jaltocan – Felipe Ángeles International Airport route.
    Advice and support from a technical, legal, and financial feasibility perspective for structuring a mobility, food, and infrastructure strategy.
  • Expansion of System 1 of the Lechería-Xaltocan-New Santa Lucía International Airport Suburban Train.
    Demand study, feasibility and cost-benefit analysis.
    Ferrocarriles Suburbanos S.A.P.I. de C.V. obtained Supplier Registration for compliance with legal, financial, operational, and commercial aspects of the consulting services we provide.
  • Mass Passenger Transport Toluca-Valley of Mexico.
    Control, surveillance, monitoring, and evaluation of documentation that proves the correct use of federal resources.
  • Extension of STC Line 12, section: Mixcoac – Observatorio.
    Application monitoring, tracking and controlling resources.

Road Transportation

  • Apizaco Western Bypass
    Updating the demand study and preparing the cost-benefit analysis.
  • Jiquilpan-Sahuayo Bypass, Mexico-Guadalajara Highway Junction.
    Demand and economic feasibility study.
  • Galarza-Amatitlanes bypass, between Puebla and Morelos.
    Demand and economic feasibility study.
  • MENDOZA-CÓRDOBA HIGHWAY.
    INTEGRAL OPERATION STUDY.
  • Toll Station and Travel Info Centers.
    Technical Consulting and Project Management.
  • Chamapa-Lechería Highway.
    Preparation of studies and projections.
  • Arco Sur Elevated Road, over Periférico Sur, Tlalpan Viaduct and the Mexico-Cuernavaca Highway.
    Consulting in project structuring.
  • Guadalajara Elevated Viaduct.
    Specialized advice for the legal, technical, economic, and financial integration of the competition rules and documents.
  • Elevated viaduct over lines N and C from Bosque Real to Buenavista
    Advisory Services for project development.
  • Update of registration keys requested by the General Directorate of Highways 2020.
    Updating cost-benefit analysis keys.
  • Construction of the bridge over the Ameca River and Av. Federación, in the states of Jalisco and Nayarit.
    Update of the Demand and Socioeconomic Prefeasibility Study.
  • Modernization of Federal Highway MEX-180, Sections: San Andrés Tuxtla-Catemaco and Cosoleacaque-Jáltipan-Acayucan, in the State of Veracruz.
    Update of the Demand and Socioeconomic Prefeasibility Study.
  • Modernization of Alberto Limón Padilla Boulevard, in the State of Baja California.
    Demand Study and Socioeconomic Pre-feasibility.

Air Transportation

  • Mexico City International Airport.
    Consulting for operations improvement and optimization, external consulting, and participation in project management.
  • Air Cargo Terminal in Tijuana.
    Specialized Consulting Services.
  • Strategic Operations Design for Airports and Auxiliary Services. (ASA's New Vision)
    Specialized advice
  • Feasibility of a Regional Airline in Sonora.
    Preparation of Studies.
  • Competition conditions in passenger air transport in El Salvador.
    Consulting and study preparation.
  • Relocation of Tampico International Airport, Tamps.
    Specialized advice in project coordination and development.
  • Mexico-Spain Air Market Study and Competitive Improvement Proposal for Pullmantur Air.
    Specialized advice
  • Accreditation of capabilities and obtaining an airworthiness certificate from Aviacsa.
    Specialized advice
  • Specialized consulting services for Volaris.
    Implementation of Options to Boost Passenger Traffic in the Valley of Mexico Air Market.
    Fuel supply, marketing, storage, distribution, sale, supply and suction.
    Volaris has awarded us the 91 Circle of Suppliers Certification, a Platinum distinction, for compliance with legal, financial, operational, and commercial aspects of the consulting services we provide.
  • Specialized consulting services for the ASUR Group.
    Specialized consulting to carry out the “Estimation of the Efficiency Factor X in the Maximum Joint Rate Formula”.
  • Specialized consulting services for Airports and Auxiliary Services.
    Comprehensive Diagnosis based on its Statutory Purpose and the National Context.

Multimodal

  • Specialized consulting for companies, Distribution and Logistics Services, S.A. de C.V. (DISELO)
    ADVICE ON NORMATIVITY, REGULATION AND OPERATION OF INTER/MULTI-MODAL TRANSPORTATION.
  • Querétaro Intermodal Terminal (TIQ)
    Specialized consulting to achieve a steady flow of containerized cargo of 3,000 units per month.
  • Mexico City Intermodal Terminal.
    Design, planning, and specialized consulting on the regulatory aspects of inter/multimodal logistics services.
  • Punta Colonet Multimodal Project.
    Participation in planning and design.
  • Malting Barley Unloading Terminal in Rafael Lara Grajales, Puebla.
    Data analysis, site evaluation, and development of a Conceptual Plan with a geometric approach.
  • Consulting services for WTC.
    Consulting, management, and promotion to public and private entities for the development of air cargo and multimodal terminals.

Energy

  • Reactivation of a biodiesel production plant in the port of Chiapas.
    Specialized consulting for project development and obtaining authorization from the state government.
  • Development of public policy recommendations to boost the electricity sector's infrastructure.
    Services for the Fund for Financing Studies for Infrastructure Projects (FEPI)
  • Strategic plan for oil services.
    Oil services consultancy Olimpia S.A. de C.V.
  • Consulting services for establishing maximum rates for jet fuel storage services at airports.
    Specialized Advice to the CRE.

Other Projects

  • Mazatlán Maritime Terminal.
    Updating port fees and obtaining authorization from the SCT.
  • Inventory of electronic waste generation in Mexico, at the national and state levels.
    Services provided for the United Nations National Programme UNDP.
  • Diagnostics, action plans, and training to reduce emissions of unintentional persistent organic pollutants at seven sites/industries in Ecuador.
    Services provided for the United Nations Development Programme.
  • Strategic plan of the Mexican Chamber of the Construction Industry (CMIC)
    Preparation of the plan.
  • Special Economic Zones.
    Consulting for project planning, coordination and control, and for the contracting of complementary studies.
  • Development prospects for international trucking in Mexico and the opening of cross-border transport.
    Study for the OAS on “Mexico’s International Motor Transport”
  • Olimpia Oil Services.
    Specialized advice regarding the development of your Strategic Plan.

Urban mobility

  • Mexibus Line IV ecological corridor “Indios Verdes – Tlanepantla – Ecatepec – Tecámac” in the State of Mexico.
    Review, validation of supply and demand, and integration and participation of carriers.
  • Integrated Urban Transportation System Mérida y su Zona Metropolitana. (SITUR)
    TECHNICAL CONSULTING, STUDY DEVELOPMENT AND PROJECT MANAGEMENT.
  • MASS PASSENGER TRANSPORT CORRIDOR, ROUTE 1, CHACHAPA – TLAXCALANCINGO
    Project management and start-up consulting. 
  • Urban Mobility Project of the City of Chilpancingo, Gro.
    Business Plan and Pre-Feasibility Studies.
  • Toluca-Tenango and Ramales Corridor.
    Consulting and studies for its implementation.
  • Zinancantepec-Lerma Mass Transit Corridor in Edomex.
    Consulting for infrastructure concessions.
  • Mexibus 1 Azteca City – Tecámac Corridor.
    Design, Strategy and Implementation.
  • “Metrobús Laguna” Project
    Consulting and studies for its implementation.
  • Mexibus IV Indios Verdes-Tlalnepantla-Ecatepec-Tecámac, State of Mexico
    Proposal for Restructuring the Route System.
    Review, validation of supply and demand, and integration and participation of carriers.

Rail Mobility

  • Expansion of System 1 of the Lechería-Xaltocan-New Santa Lucía International Airport Suburban Train.
    Demand study, feasibility and cost-benefit analysis. 
  • Railway system between the municipalities and/or mayors' offices of Chalco, Valle de Chalco, Ixtapaluca, La Paz, Chimalhuacán, Chicoloapan, Iztapalapa and Tláhuac.
    Comprehensive management for conducting pre-investment studies.
  • Puebla-Cholula Tourist Train.
    Preparation of Studies and Executive Project.
  • Transpeninsular train from Chichen-Itza to Punta Venado and Cancun.
    Preliminary projects, basic engineering and executive projects.
  • Guadalajara Urban Electric Train (Line 1)
    Legal, Technical, Financial and Management Consulting for the Project's expansion and remodeling.
  • Merida Punta Venado Transpeninsular Train.
    Complementary studies for the preparation of the executive draft.
  • TEG- Guanajuato Express Train.
    Preparation of the cost-benefit analysis and financial evaluation of the project.
  • Mass Passenger Transport Toluca-Valley of Mexico. 
    Pre-investment studies and cost-benefit analysis of the project.
  • STC Metrorrey.
    Technical assistance in the development of expansion projects.
  • Rail projects for Bombardier.
    Consulting for the identification, development, evaluation and execution of projects.
  • Suburban Railway System 1 of the Buenavista – Cuautitlán Metropolitan Area (ZMVM), 27 km.
    Design, strategy and implementation.
  • Suburban Train Expansion Project to extend the six terminals along the Lechería – Jaltocan – Felipe Ángeles International Airport route.
    Advice and support from a technical, legal, and financial feasibility perspective for structuring a mobility, food, and infrastructure strategy.
  • Expansion of System 1 of the Lechería-Xaltocan-New Santa Lucía International Airport Suburban Train.
    Demand study, feasibility and cost-benefit analysis.
    Ferrocarriles Suburbanos S.A.P.I. de C.V. obtained Supplier Registration for compliance with legal, financial, operational, and commercial aspects of the consulting services we provide.
  • Mass Passenger Transport Toluca-Valley of Mexico.
    Control, surveillance, monitoring, and evaluation of documentation that proves the correct use of federal resources.
  • Extension of STC Line 12, section: Mixcoac – Observatorio.
    Application monitoring, tracking and controlling resources.

Road Transportation

  • Apizaco Western Bypass
    Updating the demand study and preparing the cost-benefit analysis.
  • Jiquilpan-Sahuayo Bypass, Mexico-Guadalajara Highway Junction.
    Demand and economic feasibility study.
  • Galarza-Amatitlanes bypass, between Puebla and Morelos.
    Demand and economic feasibility study.
  • MENDOZA-CÓRDOBA HIGHWAY.
    INTEGRAL OPERATION STUDY.
  • Toll Station and Travel Info Centers.
    Technical Consulting and Project Management.
  • Chamapa-Lechería Highway.
    Preparation of studies and projections.
  • Arco Sur Elevated Road, over Periférico Sur, Tlalpan Viaduct and the Mexico-Cuernavaca Highway.
    Consulting in project structuring.
  • Guadalajara Elevated Viaduct.
    Specialized advice for the legal, technical, economic, and financial integration of the competition rules and documents.
  • Elevated viaduct over lines N and C from Bosque Real to Buenavista
    Advisory Services for project development.
  • Update of registration keys requested by the General Directorate of Highways 2020.
    Updating cost-benefit analysis keys.
  • Construction of the bridge over the Ameca River and Av. Federación, in the states of Jalisco and Nayarit.
    Update of the Demand and Socioeconomic Prefeasibility Study.
  • Modernization of Federal Highway MEX-180, Sections: San Andrés Tuxtla-Catemaco and Cosoleacaque-Jáltipan-Acayucan, in the State of Veracruz.
    Update of the Demand and Socioeconomic Prefeasibility Study.
  • Modernization of Alberto Limón Padilla Boulevard, in the State of Baja California.
    Demand Study and Socioeconomic Pre-feasibility.

Air Transportation

  • Mexico City International Airport.
    Consulting for operations improvement and optimization, external consulting, and participation in project management.
  • Desarrollo de terminales de carga aérea y multimodal.
    Asesoría, gestión y promoción a entidades públicas y privadas.
  • Air Cargo Terminal in Tijuana.
    Specialized Consulting Services.
  • Strategic Operations Design for Airports and Auxiliary Services. (ASA's New Vision)
    Specialized advice
  • Feasibility of a Regional Airline in Sonora.
    Preparation of Studies.
  • Competition conditions in passenger air transport in El Salvador.
    Consulting and study preparation.
  • Relocation of Tampico International Airport, Tamps.
    Specialized advice in project coordination and development.
  • Mexico-Spain Air Market Study and Competitive Improvement Proposal for Pullmantur Air.
    Specialized advice
  • Accreditation of capabilities and obtaining an airworthiness certificate from Aviacsa.
    Specialized advice
  • Specialized consulting services for Volaris.
    Implementation of Options to Boost Passenger Traffic in the Valley of Mexico Air Market.
    Fuel supply, marketing, storage, distribution, sale, supply and suction.
    Volaris has awarded us the 91 Circle of Suppliers Certification, a Platinum distinction, for compliance with legal, financial, operational, and commercial aspects of the consulting services we provide.
  • Specialized consulting services for the ASUR Group.
    Specialized consulting to carry out the “Estimation of the Efficiency Factor X in the Maximum Joint Rate Formula”.
  • Specialized consulting services for Airports and Auxiliary Services.
    Comprehensive Diagnosis based on its Statutory Purpose and the National Context.

Multimodal

  • Specialized consulting for companies, Distribution and Logistics Services, S.A. de C.V. (DISELO)
    ADVICE ON NORMATIVITY, REGULATION AND OPERATION OF INTER/MULTI-MODAL TRANSPORTATION.
  • Querétaro Intermodal Terminal (TIQ)
    Specialized consulting to achieve a steady flow of containerized cargo of 3,000 units per month.
  • Mexico City Intermodal Terminal.
    Design, planning, and specialized consulting on the regulatory aspects of inter/multimodal logistics services.
  • Punta Colonet Multimodal Project.
    Participation in planning and design.
  • Malting Barley Unloading Terminal in Rafael Lara Grajales, Puebla.
    Data analysis, site evaluation, and development of a Conceptual Plan with a geometric approach.
  • Consulting services for WTC.
    Consulting, management, and promotion to public and private entities for the development of air cargo and multimodal terminals.

Energy

  • Reactivation of a biodiesel production plant in the port of Chiapas.
    Specialized consulting for project development and obtaining authorization from the state government.
  • Development of public policy recommendations to boost the electricity sector's infrastructure.
    Services for the Fund for Financing Studies for Infrastructure Projects (FEPI)
  • Strategic plan for oil services.
    Oil services consultancy Olimpia S.A. de C.V.
  • Consulting services for establishing maximum rates for jet fuel storage services at airports.
    Specialized Advice to the CRE.

Other Projects

  • Mazatlán Maritime Terminal.
    Updating port fees and obtaining authorization from the SCT.
  • Inventory of electronic waste generation in Mexico, at the national and state levels.
    Services provided for the United Nations National Programme UNDP.
  • Diagnostics, action plans, and training to reduce emissions of unintentional persistent organic pollutants at seven sites/industries in Ecuador.
    Services provided for the United Nations Development Programme.
  • Strategic plan of the Mexican Chamber of the Construction Industry (CMIC)
    Preparation of the plan.
  • Special Economic Zones.
    Consulting for project planning, coordination and control, and for the contracting of complementary studies.
  • Development prospects for international trucking in Mexico and the opening of cross-border transport.
    Study for the OAS on “Mexico’s International Motor Transport”
  • Olimpia Oil Services.
    Specialized advice regarding the development of your Strategic Plan.